How To Build In Your Fridge With A Cabinet On Top

We learned with our first kitchen that building in your fridge is a huge help in making a kitchen look fancy schmancy. And at the moment our floating fridge was looking pretty much the exact opposite.

That’s where an also less than schmancy $19 cabinet from the Habitat For Humanity ReStore (mentioned yesterday) came in handy. It’s 12″ tall and 36″ wide, the exact width of our fridge. And when you take off the don’t-match doors (we’re hoping to retrofit extra existing doors to make it seamlessly match the other cabinets later), it starts to look more like a workable piece of cabinetry to sit atop our refrigerator.

For the sides of our built-in fridge, I picked up two 4′ x 8′ pieces of plywood that the Lowe’s guy recommended for cabinet work (he said it’s the same stuff they sell folks who get theirs built-in by pros as part of their kitchen installation process). They even cut it to size for me right in the wood cutting area, which was a huge help. The planks were still too big for our Altima so I rented the $19 Lowe’s truck to get it home. The truck rental, fridge planks, plus a few 1 x 2″ pieces of pine trim brought my grand total to about $90. Good thing that ReStore cabinet was cheap ($19).

The point of the trim pine was to make the front edge look more finished and a bit more substantial looking. So I broke out my trusty Kreg jig and drilled a bunch of holes down one edge of both plywood pieces.

With my holes drilled, I sanded both sides of the plywood to make sure they were smooth. And while I was at it I sanded the finish off the front of the cabinet so it’s primer/paint ready (we’ll tackle it when we tackle the rest of our existing cabinets after the counters get installed so nothing gets chipped or scratched off during that stage).

Then I carefully clamped and screwed the pine trim to the plywood piece so that the edges were flush. Having been around block with my Kreg by now, I’ve learned that it’s sometimes helpful to drill a second hole just to put the special Kreg clamp into. This is me trying to think ahead.

Eventually (note that I didn’t say “soon” – this part took me about an hour) I had the trim attached just the way I wanted on both pieces of plywood.

Attaching the cabinet took some thinking ahead too. Since we wanted the cabinet to sit flush with the trim (not behind it) and needed the opening to be slightly wider than our fridge (which was the same width as the cabinet) – I had to add some filler pieces (aka, leftover scraps). One stack of scrap wood went up at the front of the cabinet and the other was located at the back (neither of which would be seen at all once it was all installed).

Here’s the same view with the cabinet sitting on it, to give you a better idea of why the filler was needed (I ended up adding a wooden shim to make sure the cabinet sat 100% straight).

We didn’t actually attach the cabinet until we got everything back inside, since I wasn’t about to try to maneuver this whole thing from my patio-workspace through a few doors and into the kitchen. So here we are in the kitchen, with the cabinet screwed to one of the plywood sides. Here’s where Sherry put Clara down for a nap and came in to help.

We brought in the second side and used our camera tripod as makeshift jack to hold it in place while we screwed it all together, checking and double checking that everything was square and level.

Before standing it up we added a spare board across the back to help keep everything straight and supported from front to back. It’s also the board we later drilled through to screw the whole thing into the wall (didn’t want it falling over on anyone!). We also put a similar plank of wood across the bottom (again to keep things square and to allow us to screw the whole piece into the wall).

Then we heave-ho’d it up to a nice standing position…

… and slid it into place (after temporarily removing the bottom support slat so we could slide it over the fridge like a slipcover).

We’re not saying “ta-da!” quite yet, since there’s still lots to be done to it. Like priming and painting it, priming and painting the paneling behind it, adding matching doors, adding molding around the top, adding trim around the bottom, etc. But for now, we’re enjoying one pretty noticeable step towards making the kitchen look a lot more pulled together.

It’s definitely an upgrade from the un-built-in version, right?

Oh and if you scroll back up to the built-in pic above this one, you’ll notice that the fridge sticks out just a smidge from the wooden sides. That’s just a functional thing (it can slide a bit farther in, but the doors wouldn’t open as wide as we needed them to in order to access certain slide-out fridge drawers without hitting the wood frame). But it’s nice because the new built-in sides block all of the black coloring on both sides of the fridge – so all that’s visible is the stainless front (and a smidge of the sides of the doors – which are still stainless). It’s definitely going to be a huge upgrade to have a custom looking fridge setup along with the flush front cabinet up top (our old above-fridge cabinet was set about 6″ back, so it was a lot harder to access).

So that’s the latest slow but steady kitchen progress. Next on the agenda is attempting to finalize the placement of the peninsula (we still need one more cabinet to complete that area) by the end of this week so that we can finalize the placement of the giant eight foot doorway to the dining room that we’ll be adding with the help of a pro (which we hope to begin sometime next week!). Is it next week yet? Should be interesting/scary/exciting/dusty. As always, we’ll keep you posted!

Psst- We’re over on BabyCenter sharing an update on how we organize and store Clara’s outgrown clothes. And we’d love to hear your storage secrets on the subject.

Comments

  1. Stephanie Phillips says

    Do you have any idea how many people come clicking over here at 10:00am on the dot for a kitchen update?? I don’t either, but I know I am here every morning!

    That tripod-as-jack is pretty funny. You take the “work with what ya got” to a whole new level.

    Can’t wait for next week!

    • Miranda @boucksy says

      Stephanie, I’m with you! I’m in the Central time zone and come over here ASAP around 9am just to see if there’s my first-blog-of-the-morning post. Then, I’m right back here about 1:30 to see if the afternoon post is up! Favorite blog, EVER!

    • Donita says

      I do the same thing girls, only I’m pacific time zone, so it it 7:00 for me. :-) LOVE this blog too!!!! I can’t wait for next week and the peninsula and wall opening.

    • Lindsay says

      I was so excited when I was working out of town in AZ for a couple weeks, and I got to read the post first thing when I got to work at 7:30 since I normally have to wait til 10 on East Coast time. LOVE YHL!

    • Harinee says

      Let me add my bit – I’m on the opposite side of the world so I start checking every evening at 7:00 pm… and sometimes am up late till 12 ish to catch the next one too!

  2. CandiL says

    Lookin’ good! When you all are done…wanna come redo my kitchen for me?!? Pretty pretty please! I’ll even throw a cherry on top!! ;)

  3. says

    Your new built in looks very nice, even though it’s not finished! You two always are so good at giving great ideas to update our own houses, I appreciate it!

  4. says

    i’m loving the progress. but a quick question — is there a reason you aren’t painting the wall behind the fridge before you add the cabinets? will you just wait until you are done and paint only the visible areas? just curious.

    • says

      Since the whole cabinet and fridge can be pulled out, we just thought it would be smarter to do touch up painting after the wall is opened to create the door to the living room. That way we just have to get the primer and paint out once instead of a few times in a row!

      xo,
      s

  5. Meagan says

    So are you sure John doesn’t have a younger (single) brother?? Because dang Sherry…you are one lucky girl…is there anything John can’t build? haha.

  6. says

    Hey guys! Long-time reader and LOVE your blog, but I have to comment on something that bugs the grammar nazi in me very often.

    Farther should be used instead of further when referring to a distance.

    Your fridge looks awesome with the built-in stuff around it. It *almost* makes me motivated enough to do the same in my kitchen. :)

    Keep up the good work.

  7. says

    Bwahaha the title of this reminded me of Kris Kross – Jump.

    “Build it up, build it in, let me begin.” Who’s rad? <— this little lady right here.

  8. says

    Random kitchen question: Do your cereal jars have the rubber ring around the lid for an air tight seal? I bought one at Walmart, but it didn’t have the seal. Does your cereal go stale in the jars?